
New TopShim run:

version = topshim 2.4.0
date = 2024-10-10
time = 11:44:44.344
command = topshim  convcomp tuneaxyz

FINE SHIMMING

Parameters:

probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Low S/N encountered. The acquisition parameters will be changed to improve this issue.
Iteration  1: FWHM Before= 2.5 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.5 Hz, After= 0.6 Hz
Iteration  3: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  4: FWHM Before= 0.6 Hz, Target= 0.6 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.64


Performing tune after shimming
tune lock level increase = 1.1

shim changes: 
Z	-18
Z2	-49
Z3	+79
Z4	-328
Z5	+175
X	+159
Y	+159

duration = 3 min 41 sec
completed successfully
finished Thu Oct 10 11:48:24 2024


========================================================================
